50 lines
2.7 KiB
Markdown
50 lines
2.7 KiB
Markdown
# Week-based Gantt example
|
||
|
||
The [contract](contract.md) captures the active List/Gantt workflow in stok's
|
||
`web/static/timeline-views.js` at `f589919`. The calendar implementation is dormant and is
|
||
not a default in this pattern. The [source audit](../web-visual-baseline/stock-review-2026-10-03.md)
|
||
distinguishes adopted decisions from outstanding implementation gaps.
|
||
|
||
## Shared geometry
|
||
|
||
Load canonical `view.css` first. This four-week example demonstrates geometry only; the server
|
||
or application computes week columns, bar positions, dates and status from the same records
|
||
as the list. Production ranges may contain more weeks and scroll horizontally.
|
||
|
||
```css
|
||
.gantt { max-height: 68vh; overflow: auto; border: 1px solid var(--border); border-radius: 4px; }
|
||
.gantt-row { display: grid; grid-template-columns: 260px minmax(224px, 1fr); min-width: 484px; border-bottom: 1px solid var(--border-lite); }
|
||
.gantt-header { position: sticky; top: 0; z-index: 3; background: var(--surface-2); }
|
||
.gantt-name { position: sticky; left: 0; z-index: 2; padding: 6px 9px; background: var(--surface); border-right: 1px solid var(--border); }
|
||
.gantt-weeks { display: grid; grid-template-columns: repeat(4, minmax(56px, 1fr)); }
|
||
.gantt-track { position: relative; min-height: 34px; }
|
||
.gantt-bar { position: absolute; top: 2px; bottom: 2px; border: 1px solid var(--border); border-radius: 4px; background: var(--accent-bg); color: var(--ink); white-space: nowrap; cursor: pointer; }
|
||
.gantt-bar:focus-visible { outline: 2px solid var(--accent); outline-offset: 1px; }
|
||
.gantt-fact { position: absolute; top: -1px; bottom: -1px; width: 3px; background: currentColor; }
|
||
```
|
||
|
||
```html
|
||
<p>2026 · W40–43</p>
|
||
<div class="gantt" tabindex="0" role="region" aria-label="Planning timeline">
|
||
<div class="gantt-row gantt-header">
|
||
<div class="gantt-name">Record</div>
|
||
<div class="gantt-weeks"><span>W40</span><span>W41</span><span>W42</span><span>W43</span></div>
|
||
</div>
|
||
<div class="gantt-row">
|
||
<div class="gantt-name">Order DEMO-01</div>
|
||
<div class="gantt-track">
|
||
<button type="button" class="gantt-bar" style="left:0;width:50%"
|
||
aria-label="Edit DEMO-01, 10 units, planned W40–41 of 2026, in transit">
|
||
10 units · In transit
|
||
</button>
|
||
</div>
|
||
</div>
|
||
</div>
|
||
```
|
||
|
||
For a parent with meaningful children, place a dedicated native button with `aria-expanded`
|
||
inside the name cell and wire it to child visibility. Keep that handler separate from the bar's
|
||
edit handler. Do not add an expand affordance for a leaf or a child identical to its parent.
|
||
An actual-date marker can use `.gantt-fact` with an accessible date in the bar label. Provide
|
||
a visible legend for markers and open-ended spans. Never rely on their color alone.
|