1.8 KiB
1.8 KiB
Contract: Timeline Views
Version: 1.0
Scope
An optional Gantt view for dates and parent/child records already represented by an operator
table. Visual styling inherits web-visual-baseline; filters inherit table-management.
This pattern comes from stok's active List/Gantt workflow. It does not require a calendar view.
Rules
- Keep the list as the default view. Use a compact joined List/Gantt switcher and retain the active filters when switching. Persist view/range in URL state when the page is shareable.
- Use ISO weeks for planning, with a visible range title and previous/current/next controls. Mark the current week; include the ISO year wherever week numbers would be ambiguous.
- Use a bounded scrolling surface, a sticky week header and a sticky name column. Keep filter popups above it and outside clipping ancestors using the shared dropdown mechanism.
- Parent names expand/collapse meaningful child detail. Timeline bars open the corresponding record editor. These actions must not trigger each other; both work with the keyboard.
- Keep bar labels concise (identity/quantity), with complete dates/status available on inspection and through an accessible name. Short bars must not make their labels unreadable; labels may overflow within a lane if they do not cover another control.
- Display server-supplied status with text/shape as well as color. Distinguish actual-date markers from planned spans and open-ended spans from completed ones.
- Reuse the same records and filters as the list; do not create separate business calculations for the chart. Missing dates must not silently become today's date or disappear without an unscheduled indication or an explicit count/link back to the list.
See examples for geometry and the source decisions.